Split hours by scope
Use the matching Oracle and LinkedSite codes for each part of your work. For example, book 5 hours of detailed design and 35 hours of Fuel & Gas through their respective routes.
TIME BOOKING
Choose the work you did, then match your hours to both systems.
Zones shown match this discipline's task types. Z4 (all North) includes whole-of-Z4, Z4A and Z4B tasks.
Use the matching Oracle and LinkedSite codes for each part of your work. For example, book 5 hours of detailed design and 35 hours of Fuel & Gas through their respective routes.
Submit separate LinkedSite timesheets for different cost codes. Within one cost code, you can use multiple task types and split the hours between packages.
Detailed Design: 60791608 / 1.4
Additional Scope: 60791608 / 2.3
P&E Secondment: 60794190 / 1.6